Mezzanine Installers UKFree quote
Menu

Storage mezzanine floors

A storage mezzanine is the simplest kind: a steel deck for shelving, boxed stock, archives or spares, reached by one staircase and loaded through a pallet gate. Kept small and used only for storage by a few staff, it can often go without a fire-rated ceiling, which keeps it the cheapest mezzanine per square metre. A 50 m² storage floor typically costs £12,300 to £25,900, and 100 m² about £15,700 to £36,000.

Get a free quote

A free matching service, not a mezzanine floor installer. We find one who covers your area and tell you who they are before anything is shared. How it works

Good reasons for a storage mezzanine

  • Shelving, archives or spares are taking up ground floor space that could earn money.
  • Stock is light enough to go on shelving or in totes rather than on pallets.
  • You have about 5 metres or more of height and an area free of overhead services.
  • Only a few trained staff will go up there, and never the public.
  • You want a structure that can be moved to new premises when the lease ends.
  • The floor can stay under 20 metres in each direction, keeping fire protection out of the price.

What a storage mezzanine costs

JobTypical price
25 m² storage floor
One stair, handrail, building control
£8,100 to £18,500
50 m² storage floor
One stair, handrail, building control
£12,300 to £25,900
100 m² storage floor
One stair, handrail, building control
£15,700 to £36,000
200 m² storage floor
One stair, handrail, building control
£21,200 to £54,900
50 m² storage, published
Western Industrial, supplied and installed
£8,000 to £12,000
Published fully installed rate
Storage floors, The Mezzanine Company
£300 to £400 per m²

Ranges built from published figures: The Mezzanine Company (July 2026), Western Industrial (October 2026), Checkatrade (September 2026) and MyBuilder (October 2026), read 26 October 2026. Each includes one staircase, handrail on two open sides and building control. Figures exclude VAT at 20%, which most VAT-registered businesses can reclaim. A guide, not a quote. Add a pallet gate (£1,000 to £1,200) if goods will go up by forklift. The cost calculator works out a range for your floor.

Open the cost calculator

What a good quote includes

Ask for these six points in writing. Two quotes that cover them can be compared line by line.

  1. Design load, in writing

    The uniformly distributed load in kN/m² and the point load the deck is designed for. General storage and shelving is commonly designed at 4.8 kN/m²; archives of paper are heavier than they look.

  2. Plan, grid and heights

    A drawing with the deck size, column positions, the finished floor level and the clear height left under and over the deck.

  3. Deck and finish

    Board type and thickness (for example P5 chipboard, plywood, steel or concrete), plus any anti-slip or painted finish.

  4. Fire protection

    Whether the floor qualifies as a storage floor that needs no fire-rated ceiling, and if so what smoke detection is still needed under the deck.

  5. Stairs, handrail and gates

    How many staircases, their width, the handrail and edge protection, toe boards and any pallet gates, each priced as a line.

  6. Building control and handover

    Who applies for building regulations approval, whether the fee is included, and what you receive at the end: calculations, drawings, completion certificate and a loading notice.

Planning a storage mezzanine? Tell us its size and use and we will find an installer who covers your area.

Ask for a free quote

How a storage mezzanine goes in

  1. Survey

    The installer measures the building, checks the slab, columns, lights, sprinklers and doors, and asks what the floor will carry and how goods and people will reach it.

  2. Design and quote

    A layout drawing with the load rating, column grid, stairs and fire protection, then a written price. Expect to compare two or three designs, not just prices.

  3. Building regulations

    Drawings and structural calculations go to building control, from the council or a registered building control approver, before work starts.

  4. Install

    Columns, beams and deck go up first, then stairs, handrail, gates and any fire-rated ceiling and column casings. Most floors take days to a few weeks on site.

  5. Sign-off

    Building control inspects and issues a completion certificate. You should also receive the drawings, calculations and a loading notice to display on the floor.

Questions people ask

Can a storage mezzanine go without fire protection?

Often, if it is small and storage only. Approved Document B (paragraphs 7.6 and 7.7) allows raised storage floors used by few people, and never the public, to be treated differently. Industry guidance from Rapid Racking in Logistics Matters says floors over 10 metres in any direction need smoke detection underneath and floors over 20 metres need a fire ceiling, fascia and column casings unless the building is sprinklered.

How much can a storage mezzanine hold?

Western Industrial lists 4.0 kN/m² for archives and 4.8 kN/m² (about 480 kg per m²) for general storage and shelving. A loading notice should be fixed by the stairs so staff know the limit.

Can I move a storage mezzanine to new premises?

Freestanding bolted mezzanines can be taken down and rebuilt, though the new building will have different heights and slab, so expect some redesign and a new building regulations application.

Is a ladder enough to reach a storage mezzanine?

Not as a rule. Approved Document K points industrial buildings to BS 5395-3 for stairs, ladders and walkways, and a fixed ladder is not an acceptable escape route for the public. Most storage floors have a proper staircase.

Do I need building regulations approval for a mezzanine?

Yes, in almost every case. A mezzanine adds structure and changes how people escape in a fire, so it is building work under the Building Regulations. The installer usually prepares the drawings and calculations and makes the application to the council or a registered building control approver.

How long does a mezzanine floor take to install?

Less time on site than people expect. MyBuilder puts commercial construction at 4 to 6 weeks including design and fabrication, and Pallite gives 8 to 16 weeks from first enquiry to handover. The steelwork itself often goes up in days.

Get free storage mezzanine quotes

Three short steps: where the building is, what the floor is for, and how to reach you. It takes about two minutes, and rough answers are fine.

This is a free matching service, not a mezzanine floor installer. We find one who covers your area and name them to you first. Nobody contacts you until you say yes.

Step 1 of 3

Where is the building?
Get a free quote